10 exam-style questions with answers and explanations, straight from our 1,100-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.
A facility manager replaces 80 fluorescent light fixtures with new LED fixtures throughout an office floor. The total cost is $42,000, and the manufacturer rates the LEDs for a 15-year service life. The expenditure is MOST APPROPRIATELY classified as:
Show answer & explanation
Correct answer: C - A capital expense, because the assets have a useful life greater than one year and exceed typical capitalization thresholds
Question 2
Occupants on the 14th floor of a high-rise office building report a strong, sweet chemical odor accompanied by complaints of headache and dizziness. The facility manager's FIRST action should be to:
Show answer & explanation
Correct answer: A - Evacuate the affected floor and notify the building's emergency response team
Question 3
A 500,000-sf office building has $6 million in deferred maintenance backlog. The current replacement value is $75 million. The Facility Condition Index (FCI) indicates the building is in:
Show answer & explanation
Correct answer: B - Fair condition
Question 4
A facility manager is rolling out a major workplace transformation, moving from assigned seating to activity-based working across a 250,000-sf headquarters. Six months after launch, occupancy data shows utilization is far below projections, and informal observations reveal staff are quietly reverting to claiming "their" desks. According to the ADKAR model, which element was MOST LIKELY underemphasized during the rollout?
Show answer & explanation
Correct answer: C - Reinforcement to sustain the change
Question 5
A hospital's IT recovery plan specifies that, following a disruption, patient billing systems must be functional within 6 hours and the organization can tolerate the loss of no more than 1 hour of data. The Recovery Time Objective (RTO) and Recovery Point Objective (RPO) are, respectively:
Show answer & explanation
Correct answer: A - RTO = 6 hours; RPO = 1 hour
Question 6
A facility manager is preparing the organization's annual sustainability report. Refrigerant leakage from the building's chillers during the reporting year totaled 45 kg of HFC-134a. Under the GHG Protocol, these emissions should be reported as:
Show answer & explanation
Correct answer: A - Scope 1 emissions, because they are direct emissions from owned and operated equipment
Question 7
In a 200,000-sf hospital, the maintenance team's central stockroom is located in the basement. Technicians average 12 trips per shift to retrieve parts because frequently-used items are not stocked in satellite locations near the work areas. Under Lean methodology, this scenario MOST DIRECTLY illustrates the waste of:
Show answer & explanation
Correct answer: C - Motion
Question 8
A facility manager is evaluating a lease for 23,000 rentable square feet (RSF) in a Class A office building. The building has a 15% load factor. The usable square footage (USF) available to the tenant is approximately:
Show answer & explanation
Correct answer: B - 20,000 USF
Question 9
In February 2024, NIST released Cybersecurity Framework (CSF) 2.0. The most significant structural change from CSF 1.1 was:
Show answer & explanation
Correct answer: A - The addition of "Govern" as a sixth core function
Question 10
A construction project has a Budget at Completion (BAC) of $500,000. At the current status review, the Earned Value (EV) is $200,000, the Actual Cost (AC) is $250,000, and the Planned Value (PV) is $240,000. The project's Cost Performance Index (CPI) indicates that the project is:
Show answer & explanation
Correct answer: B - Performing worse than planned, with a cost overrun of approximately 25%